国产伦精品一区二区三区网站,yellow中文字幕网,欧美另类一区,中文字字幕码一二三区

Transferred from-Mysteel: Tracking the production of the wrong peak of Tianjin Iron and Steel Enterprise

發(fā)布時間:[2019-1-12 9:23:49]    瀏覽量:3065次
[Introduction]
It is predicted that heavy pollution will occur in our city from January 11, 2019, in line with the yellow warning conditions for heavy pollution weather stipulated in the "Tianjin Heavy Pollution Weather Emergency Plan"(Tianjin Administrative Office Letter[2018] No. 65). A yellow warning of heavy pollution weather is hereby issued.
The people's governments of various districts and the responsible units are requested, in accordance with the division of responsibilities of the "Tianjin Heavy Pollution Weather Emergency Plan", to initiate Class III emergency response measures from 0:00 on January 11 to do a good job in dealing with heavy pollution weather.
[Survey sample profile]

1, the blast furnace survey sample selected a total of 7 parent flow steel mills in Tianjin, 16 blast furnaces, and the total design capacity of blast furnace was 20.3 million tons. At present, 11 blast furnaces are normally produced, and 5 blast furnaces are discontinued. According to the work plan of industrial enterprises in the 2018-2019 heating season of Tianjin, we investigated the production limit rating and actual production limit of various steel companies:


According to the construction of the above-mentioned steel mills, it is estimated that the actual operating rate of the 7 parent flow steel mills in Tianjin is 70 %.

2, rolling line survey samples involved building materials, wire, medium thick plate, strip steel, profile, seamless pipe a total of six varieties, a total of 29 rolling lines.
There are 5 building materials production lines(thread, round steel production lines), 3 normal production, the main production round steel, the discontinued 2 are long-term suspension of production, not affected by the heating season production limit.
There are 6 wire production lines(high lines, variety lines), 2 normal production, and the main production variety lines, 4 discontinued production is a long-term suspension of production, not affected by the heating season production limit.
The production line of medium thick plate is 1, and the output is slightly below the normal level.
There are 8 steel production lines, 7 normal production lines, and 1 production line upgrade.
There are 3 profiles and 1 line production.
Seamless tube production line 6, 1 normal production, adjustment of blank rolling material.

HomeBrief IntroductionOrganizationLetter Bridge NewsProduct CenterAptitude HonorHuman ResourcesContact Us

Mailbox:taxinqiao@163.com    Website:yx1716.com
Shandong Xinqiao Industrial Co., Ltd.  Copyright         Technical support:Nuodun Network
Headquarters:0538-8151706    Fax:0538-8151704 Address:The new North Road of the steel market of Tai'ant
Branch:0538-5018001      Fax:0538-5018004 Address:Tai'an national Mountain Center

安龙县| 库尔勒市| 中方县| 察哈| 青岛市| 盈江县| 松溪县| 龙江县| 襄垣县| 博兴县| 浦东新区| 尼木县| 蚌埠市| 宁安市| 大邑县| 梨树县| 南召县| 东城区| 榆树市| 高密市| 灵武市| 台东县| 报价| 靖州| 承德县| 武邑县| 金门县| 深水埗区| 拉萨市| 绥江县| 克东县| 交城县| 长泰县| 贵港市| 祥云县| 军事| 张家川| 永嘉县| 秭归县| 呼玛县| 扎赉特旗|